Programmes and projects delivered in Canada and Türkiye.

Eglinton Crosstown LRT (Line 5)

2023 – present

Commissioning Manager · Crosslinx Transit Solutions · Toronto, Ontario

A 25-station light rail program delivered to Metrolinx under a 30-year public-private partnership. I lead commissioning delivery and readiness reporting across the facilities and systems scopes — the asset and test register, the live status reporting, compliance evidence, and the assurance behind Revenue Service Demonstration — with a five-person team. My scope has since extended into signalling oversight, covering control table testing, principle tester rules and CBTC train control across mainline and yard, alongside verification automation for that testing. Line 5 entered phased revenue service in February 2026 and the assets have since transitioned into maintenance.

  • Commissioning management
  • Systems assurance
  • Integrated systems testing
  • Compliance evidence
  • CBTC signalling & control table testing

Erzurum City Hospital

2016 – 2020

Electrical Project Manager · AKGUN Building Materials Export · Erzurum, Türkiye

Delivered the electrical scope for a major regional health campus. The defining requirement was continuity: operating theatres and life-critical medical systems cannot tolerate an interruption, so the work centred on redundant UPS and standby generation, transfer arrangements, and verification that the redundancy behaved as designed rather than only existing on the single line.

  • LV/MV distribution
  • UPS and standby generation
  • Healthcare infrastructure
  • Acceptance testing

Uşak Student Residence

2016 – 2020

Electrical Project Manager · AKGUN Building Materials Export · Uşak, Türkiye

Electrical execution for an institutional-scale student housing complex accommodating around two thousand residents — high-capacity distribution, life safety systems and lighting networks, coordinated with mechanical and civil trades across a compressed programme.

  • LV distribution
  • Life safety systems
  • Lighting networks
  • Trade coordination

Elazığ Housing Estate

2016 – 2020

Electrical Project Manager · AKGUN Building Materials Export · Elazığ, Türkiye

Electrical and infrastructure delivery for a 439-unit mass housing estate with associated commercial units — distribution network, street lighting and community systems forming the backbone of a new residential district.

  • Distribution networks
  • Street lighting
  • Urban infrastructure

Erzurum Provincial Police Headquarters

2016 – 2020

Electrical Project Manager · AKGUN Building Materials Export · Erzurum, Türkiye

Electrical systems for a provincial police headquarters, where the operating requirement was that command and communications functions remain available under any condition — resilient power distribution, standby arrangements and supporting communications infrastructure.

  • Resilient power
  • Communications infrastructure
  • Secure facilities

Amphibious Marine Brigade Command

2016 – 2020

Electrical Project Manager · AKGUN Building Materials Export · Türkiye

Electrical systems across command facilities and barracks for an amphibious marine brigade — secure power distribution, lighting appropriate to operational requirements, and hardened supporting infrastructure.

  • Secure power distribution
  • Defence infrastructure
  • Command facilities

Ankara Gültepe Commercial Hub

2016 – 2020

Electrical Project Manager · AKGUN Building Materials Export · Ankara, Türkiye

Electrical design coordination and delivery for a commercial hub — distribution, architectural and public lighting, and life safety systems for a high-footfall environment.

  • Commercial distribution
  • Architectural lighting
  • Life safety