Commissioning · Systems Assurance · Operational Readiness
Proving complex systems are ready.
Commissioning Manager on the Eglinton Crosstown LRT (Line 5), leading a five-person team across commissioning delivery, systems assurance and signalling on a $9B+ transit program.
Key facts
$9B+
Program value
Eglinton Crosstown LRT, delivered to Metrolinx under a 30-year P3
25+
Station facilities
Commissioned through staged testing to handover and occupancy
5
Direct reports
Commissioning and asset tracking team
Zero
Lost-time incidents
Across every scope led, in Canada and Türkiye
Selected work
Problems worth writing down
2023–2024
The commissioning register that became the program’s reference
A single traceable record of every asset, its required tests, its results and its evidence — across more than twenty-five station facilities.
Read it →
2025–2026
Automated verification for a 30-day revenue service demonstration
A daily performance picture produced overnight, replacing roughly eighteen person-hours of manual analysis with a forty-minute automated run.
Read it →
2025
Cutting commissioning manual production from seven months to four
A governed, approval-gated toolchain for assembling and generating handover documentation — about a 40% reduction, with transcription error removed.
Read it →
Capabilities
What I actually do
Commissioning & Assurance
- Commissioning management
- Testing & commissioning (T&C)
- Integrated systems testing
- Operational readiness
- Compliance evidence & audit readiness
- Handover and closeout
Rail & Electrical Systems
- CBTC & signalling assurance
- Control table testing
- LV/MV power distribution
- Switchgear, transformers, UPS & busbar
- Energization readiness
- Systems integration & interface management
Asset Information & Automation
- Asset registers & lifecycle data
- Power BI, DAX & Power Apps
- Python & TypeScript automation
- Primavera P6 & Smartsheet
- KPI definition & performance reporting
- Governed generative-AI tooling
In short
The straight answers
- Who is Furkan Kaya?
- Furkan Emir Sefa Kaya is a Commissioning Manager based in Toronto, Ontario. He leads commissioning delivery and systems assurance on the Eglinton Crosstown LRT (Line 5) for Crosslinx Transit Solutions, a $9B+ transit programme delivered to Metrolinx, where he manages a five-person team.
- What does Furkan Kaya do?
- He takes complex infrastructure from installation through integrated testing and operational readiness to handover, and builds the asset registers, reporting and automation that make a programme’s readiness verifiable. His technical background is electrical — LV/MV distribution, switchgear, transformers, UPS and busbar — extended into rail systems, CBTC signalling assurance and integrated systems testing.
- What is Furkan Kaya’s background?
- He holds a B.Eng. in Electrical & Electronics Engineering from Niğde Üniversitesi and a Diploma in Building Systems Engineering Technology from Seneca College in Toronto. He is engineering-trained rather than a licensed Professional Engineer in Canada. Before moving to Canada he delivered electrical scopes across seven concurrent government infrastructure projects in Türkiye.
- What makes his commissioning work distinctive?
- He builds the verification systems himself rather than only using them. On Line 5 he built the programme’s asset and test register, the live Power BI reporting layered on it, and automated verification for Revenue Service Demonstration that replaced roughly eighteen person-hours of daily manual analysis with a forty-minute overnight run.
- Where is Furkan Kaya based and is he available for work?
- He is based in Toronto, Ontario, Canada, and is open to commissioning, systems assurance and asset information roles across Canada, including remote and hybrid arrangements.
Working on something like this?
Open to commissioning, systems assurance and asset information roles across Canada.